Karandikar, HiteshHiteshKarandikarPuntambekar, UdayUdayPuntambekarYagnik, JignasuJignasuYagnikJoshi, DevangDevangJoshi2025-08-312025-08-312025-01-0110.1504/IJPQM.2025.1455762-s2.0-105002341731https://d8.irins.org/handle/IITG2025/28408The purpose of this paper is to improve the report printing activity of the electrical testing laboratory after testing. At a transformer oil testing laboratory at Vadodara, Gujarat, India, customers were facing problem of delayed report delivery after testing of oil. A detailed study of the process was done to check if the value stream mapping and value stream analysis can be applied to improve the report delivery time. After study of ‘as is’ situation a new system was implemented for the transformer oil testing laboratory. Diagram of various activities were drawn for ‘as is’ condition and time taken for each activity was noted down. The non-value adding activity consuming unnecessary time ‘waiting’ was identified and removed. A new software was developed for reporting. It resulted into reduction of report issuance time by minimum 21 days for 2,698 samples out of 5,475 samples tested during FY 20–21.falseflow diagram | PDCA | plan, do, check and act | process | process improvement | quality | transformer oil testing | value stream mappingCase study on process improvement in a 'transformer oil testing laboratory' using value stream mapping for improving service timeArticle17466482528-54620250arJournal0